Challenge
  • Dramatically reduce manufacturing cost to meet market demand for economical solar electric cells.
  • Variation in production batch size to meet short-term demand.
  • Extremely brittle crystalline material.
  • Online testing.
  • Integration with 3rd-party technology

 

Solution

  • A complete automated solution for the precision loading, anti-reflective coating, screen printing, drying, inspection, lead welding, inspection and sorting of solar electric cells.
  • A unique approach for simultaneously welding leads to the top, bottom and sides of the solar cells, eliminating cracking due to uneven loading.
  • High-accuracy vision inspection for flatness, color, cracks and edge chipping.
  • Seamless integration with 3rd-party TiO2 ovens for drying and thermal processing.
  • Complete performance testing, sorting and offloading.

 

Technologies Used
  • ATS Superbot™
  • Vision inspection system
  • Precision dispensing system
  • Medium frequency precision welding system
  • ATS cell solar simulations & cell sorting test system
  • ATS molded urethane pallet fixturing & totes
  • Integration with ovens

 

Performance Achieved
  • Machine design cycle time of 3 seconds per part.
  • Design system uptime of 90%.